The programs also incorporate a major battery at the site, to make sure excess ability is usually stored for the night, along with a 220 kV transmission line which will link the venture to the North Star sub-station, in the vicinity of the place a brand new a hundred MW https://totalsolar.com.au/solar-batteries/