1

Advanced 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has implemented a efficient 400 kW chiller, marking the noteworthy conclusion of the project. Designed to strengthen ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://bookmarklayer.com/story20749745/energy-efficient-400-kw-chiller-installation-secures-fifty-thousand-pounds-yearly-energy-savings-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story